  May June July August September October November
Box/Stand                               Engineering array
Design complete 5det. production 20det. prod.(JP)/Stand design(US) Stand production(US)
Electronics                               Construction
Produce 5 prototype elec. Decide the spec & the design / Test Order 20 units
Wireless LAN                         Shipping
Decide the spec. Order 20 units Site test Support production  
GPS                        
  Model selection   Order 20 units  
Scinti./Fiber                        
Ready for 5 units. Improve the scinti. & Decide the spec. Order 20 units
PMT                        
10 tubes are ready. Amp & LED board test Amp & LED board production / Calibrate 40 tubes
Power gen.                        
Ready for 2 units. Cost reduction & Order 20 units
Slow ctrl                        
  Design & study Test & Order 20 units
Site                        
Ready?  
Meeting   to SD top
SD local meeting 22 May 2004 @ ICRR(Kashiwa) 6F [new] Minutes
Documents/Notes   to SD top
Implementation Site
Logistics
Deployment
Instrumentation Housing
PMT / Scintillator
Frontend Electronics / Trigger
Slow Control / Weather monitor
GPS
Data Acquisition / WLAN
Power generation system
Calibration / Test bench
Data Management System
Detector Verification Simulation / Analysis[new]