SD UPDATES
LINK : To "Schedule" To "Meeting" To "Documents/Notes"
Schedule to SD top
2004 May June July August September October November Box/Stand Engineering array Design complete 5det. production 20det. prod.(JP)/Stand design(US) Stand production(US) Electronics Construction Produce 5 prototype elec. Decide the spec & the design / Test Order 20 units Wireless LAN Shipping Decide the spec. Order 20 units Site test Support production GPS Model selection Order 20 units Scinti./Fiber Ready for 5 units. Improve the scinti. & Decide the spec. Order 20 units PMT 10 tubes are ready. Amp & LED board test Amp & LED board production / Calibrate 40 tubes Power gen. Ready for 2 units. Cost reduction & Order 20 units Slow ctrl Design & study Test & Order 20 units Site Ready?
Meeting to SD top SD local meeting 22 May 2004 @ ICRR(Kashiwa) 6F Minutes
Documents/Notes to SD top Implementation Site Logistics Deployment Instrumentation Housing PMT / Scintillator Frontend Electronics / Trigger Slow Control / Weather monitor GPS Data Acquisition / WLAN Power generation system Calibration / Test bench Data Management System Detector Verification Simulation / Analysis